Ward Investments in 2022
Infrastructure
- $1 million to design the Bank Street Canal bridge over the Rideau Canal
- $19 million for integrated road, sewer and water work on Bank Street between Riverside Drive and Ledbury Avenue
- $1.3 million for integrated road, sewer and water work on Ella Street between Gordon and Craig streets, and on Ralph Street between Fifth and Holmwood avenues
- $30 million for integrated road, sewer and water work on Main Street, Greenfield Avenue, Echo Drive and Concord Street
- $2.3 million to build integrated road, sewer and water work on Riverside Drive between Industrial Avenue and the Transitway
- $1 million to design integrated road, sewer and water work on Bronson Avenue from Arlington Avenue to the Rideau Canal
- $500,000 to rehabilitate the Confederation Heights Bridge north of Walkley Road
- $20,000 to replace streetlight poles on Dow's Lake Road and Kippewa Drive
- $1.1 million to renew roads, including:
- $380,000 on Frobisher Lane
- $320,000 on Lees Avenue from Chestnut Street to west of the transitway overpass
- $380,000 on Lycée Place